The completed accelerator tunnel on 20 March 2017 (Credit: © European XFEL / Heiner Müller-Elsner)
The completed accelerator tunnel on 20 March 2017 (Credit: © European XFEL / Heiner Müller-Elsner)

The completed accelerator tunnel on 20 March 2017 (Credit: © European XFEL / Heiner Müller-Elsner)

The completed accelerator tunnel on 20 March 2017 (Credit: © European XFEL / Heiner Müller-Elsner)

Technical Details

  • Camera: Canon EOS 5DS R
  • Taken: 20 Mar 2017
  • Focal length: 17mm
  • Aperture: f/256
  • Exposure: 4.0 seconds
  • ISO: 200